Construction is almost complete on the five new villas which are located in
the valley below the house and Dragon Villa and Pool. There are ninety
steps which go down to the area. Construction was very difficult and
involved tremendous manpower to carry all the equipment and materials
down those ninety steps. At this point I do not have any photos of the
newly completed villas. The photographs in this entry are all of the early
construction and more photos will be added as they are obtained from
Wayan. Notice in some of the photographs the metal shoot which was
used to pour cement from the top of the hill down to the construction
area.